add energy | Assists in Elgin Blowout
16.04.2012
add energy is contracted by Elgin-operator Total to advise on the planning of dynamic kill from surface and two optional relief wells
 

add energy has cemented the position as a world leader within well control and incident support through is involvement in the ongoing incident on the Elgin platform in the UK sector of the North Sea.

add energy has on request from Total mobilized well control experts from their add wellflow team in Oslo. The experts from add energy are advising Total on the planning of dynamic kill from surface and two optional relief wells operations on the Elgin. Read more from Teknisk Ukeblad about the project on: www.tu.no/olje-gass/2012/04/16/norsk-ekspertise-skal-stanse-gassutblasningen 
 
The same team was also instrumental in resolving The Deepwater Horizon/Macondo blowout in the Gulf of Mexico in 2010 where add wellflow's personnel were engaged in both the Well Kill and in the Investigation teams, as well as the West Atlas/Montara blowout offshore Australia in the fall of 2009.

Since then The team has been sharing their experience and knowledge with clients, operators and authorities and has jointly held more than 100 presentations for roughly 6.000 key professionals in 8 countries.
 

     
 
skog035
green line